The pre-Surface Dressing 2020 patching and preparation works that are programmed to be carried out by the contractor Cambridgeshire Highways on B1091 Broadway, Farcet.

This work will commence on Friday 29th November 2019, and is anticipated to last 1 day.  For the duration of the works, it will be necessary to close the road between the Farcet and Yaxley speed limits; during the hours of 9.30am to 3.30pm. A signed diversion route will be in place for through traffic, and access will be given to properties within the closure, when work operations permit. However, delays are possible.